Category: Factory & Production
Home/News & Insights/Factory & Production 8D Report on a Charger: How to Run It So It Changes Something Two 8D reports described the same defect. One closed in twelve days with a fixture change; the other ran for two months and ended where it started, because step four had been written as a description of […]
Home/News & Insights/Factory & Production Charger Defect Handling: Where the Process Breaks Down A defect was reported from one market, and the same production lot was shipped to another market two weeks later. The factory had recorded the complaint, replied to it, and continued producing from the same lot, because nothing in the process required […]
Home/News & Insights/Factory & Production IQC, IPQC and OQC on a Charger Line: Splitting the Effort The gate that catches most defects is usually the one with the least inspection in it. Incoming verification and final inspection are easy to count and easy to report; the in-process gate is where the defect is actually prevented, […]
Home/News & Insights/Factory & Production Charger QC Process: Where It Breaks and How to Fix It Four failures account for most QC breakdowns on charger programmes, and three of them are visible in the paperwork within an hour. None of the four is a machine problem, and all four survive because they look like normal […]
Home/News & Insights/Factory & Production Charger Factory Audit: How to Run One That Changes Something Two audits were carried out on the same line in the same month. One produced a twelve-page report and no change; the other produced four findings, a retrained station and a revised fixture. The difference was not the auditor. It […]
Home/News & Insights/Factory & Production Charger AQL Inspection: Choosing the Plan Before the First Batch A lot passed the factory’s inspection and failed the customer’s, using the same sampling table on both sides. The table had been agreed; the defect classification had not. A scratch that the factory recorded as minor was a major defect […]
Learn how to evaluate charger functional testing, verify the evidence, identify approval risks, and define what must be checked before a production order.
Home/News & Insights/Factory & Production Charger Burn-In Test: The Programme, the Records and the Limits Two figures decide whether a burn-in programme means anything: the load the units carry and the ambient they run in. Without both, the rack produces warm units and a pass rate, not evidence. Everything else in the programme follows from […]
Home/News & Insights/Factory & Production Charger Aging Test: Comparing Burn-In Strategies Before You Commit Two programmes ship the same charger with the same specification. One ages every unit at full load for a fixed period; the other ages a sample from each shift and keeps the results. Their field failure rates differ by less than […]
Home/News & Insights/Factory & Production Charger Reliability Testing: Building a Programme That Verifies Production Four test types cover most of the field failures reported on a charger, and a programme built around them usually costs less than a single field return campaign. The order matters as much as the tests: a reliability programme that starts […]