After a failed test, when is a retest enough and when is a redesign needed?
A retest is justified only if you can show that the failure came from a test or sample error and not from the design.
A retest is justified only if you can show that the failure came from a test or sample error and not from the design.
It should let you answer quickly which units are affected, where they are and who has them.
Under FCC rules, Class B external switching power supplies can be authorized by SDoC or certification.
A pre-production sample is built before mass production to confirm the design, tooling and process, and may still have hand-made parts or trial settings.
The time depends on how ready the product and documents are, the lab’s queue, the number of tests and standards, whether tests fail and whether a factory inspection is needed.
Send the number of units the lab lists in writing, with a few spares, and give each unit a unique ID.
Keep one register of every certificate with its model, issuer, number, dates and owner, set reminders well before each date and tie renewals and follow-up inspections to named people.
Use a simple structure with a base model number for the electrical design, separate suffixes for plug type and colour and a clear rule for when a change needs a new number.
Give every batch a code, link it to the components and inspection records and keep them for the whole sale life of the product plus a safe margin that covers warranty and liability.
Keep them for as long as the product is sold and for a comfortable period after, covering warranty claims and any questions from regulators or retailers.