How do we build a bill-of-materials review into a charger OEM project?
Make the BOM part of the project plan with set review points: at quotation, before sample approval, before mass production and whenever the factory proposes a change.
Make the BOM part of the project plan with set review points: at quotation, before sample approval, before mass production and whenever the factory proposes a change.
The extra ports add parts and design work, but the gap should be explained by a bill of materials, not by a flat percentage.
A video audit is a structured live walk-through, not a casual call.
For a first order, an open-tool shell is faster and far cheaper, and lets you test the market, but other buyers may have the same shape and you do not control the design.
First read what the purchase order says about price.
Inspect at the factory whenever you can, because that is where fixes are cheapest and fastest, and the goods have not left the supplier’s control.
A design-for-compliance review is a short check of your drawings and bill of materials by an experienced engineer or test lab before tooling is cut.
For a first small shipment, DDP can be easier because the seller handles freight, duty and delivery, but it hides costs and depends on the seller’s honesty about customs.
A distribution agreement should state the territory, the products covered, exclusivity and minimums, pricing and payment, warranty and returns, compliance duties, brand use and what happens at the end.
For a 10,000-piece run, a single-cavity mould is often enough, because the moulding time is small compared with assembly and testing.