What belongs on an approved-vendor list for critical charger components?
List the parts that affect safety, performance or compliance, such as the transformer, capacitors, fuse, controller chips, connectors, cable and plastic.
List the parts that affect safety, performance or compliance, such as the transformer, capacitors, fuse, controller chips, connectors, cable and plastic.
Decide with Amazon’s current inbound requirements which barcode each unit needs, then give the factory a clear label specification: the barcode, its size, its position and the text on the outer carton.
Make the BOM part of the project plan with set review points: at quotation, before sample approval, before mass production and whenever the factory proposes a change.
For a first order, an open-tool shell is faster and far cheaper, and lets you test the market, but other buyers may have the same shape and you do not control the design.
A design-for-compliance review is a short check of your drawings and bill of materials by an experienced engineer or test lab before tooling is cut.
For a 10,000-piece run, a single-cavity mould is often enough, because the moulding time is small compared with assembly and testing.
There is no single box size for peg displays, because hooks, hole sizes and shelf spacing vary by retailer.
Yes, and it usually saves money, but a factory’s own results are a screening step. They cannot replace the accredited laboratory’s report.
Barcodes should come from GS1, registered in your brand’s name, before the factory prints your packaging. Do not let the factory choose or reuse numbers for you.
It depends on whether the change is a factory error or a new request from you. Write the rule into the tooling agreement before the mould is cut, not after the first trial.