The question

The factory told us they will use a different capacitor and transformer supplier for the next batch because of supply problems. What do we need to do with our compliance documents?

Main answer · Wecent Editorial Team

Short answer: First, get the change details in writing: which parts, new suppliers and specifications. Compare them with the safety report’s critical components list. Safety-critical parts such as transformers, capacitors across insulation, fuses, and housing material often need lab assessment, sometimes with tests. Update the report or obtain an amendment, update the technical file, check the DoC, and record which batches contain the new parts.

Last updated:

Why component changes matter

Safety test reports usually include a list of critical components, often with manufacturer, model and ratings. Changing these can affect insulation, temperature, EMC and efficiency. Without assessment, the existing report may not cover the product being shipped.

Change control steps

  1. Notification: require written notification before any change, in your supply agreement.
  2. Details: part, new supplier, ratings, certifications of the new part.
  3. Assessment: compare with the critical components list. If listed, the test lab should assess.
  4. Testing: the lab may require tests, e.g. temperature rise or dielectric strength for a transformer change, or EMC for changed switching parts.
  5. Documents: update report or obtain amendment; update technical file.
  6. Traceability: record batch codes with the new parts.

Record the old and new parts against the first affected batch

Open one change record for the proposed transformer and another for the proposed capacitor. Cross-reference them if they are planned for the same lot. That lets you trace what was actually fitted if one substitution is approved first or if the factory still uses the old part for some units.

Example record for a transformer change. Use this blank example as an internal record template. Replace each bracketed field with your own evidence before circulating the form. The example contains no actual part, lot or approval records.

Product and markets
[Charger model], [plug variants and destinations affected], [current BOM revision and drawing revision].
Old part → proposed part
[Old supplier and part number] → [new supplier and part number]. Attach both part specifications and mark which characteristics changed. Record the safety report number, revision and the page that lists the old or alternative part.
Assessment request
[Request date and owner]. Send the model, report revision, old and new part specifications, and affected variants to the laboratory or other body responsible for assessing the change. Ask it to identify the relevant report coverage and any evidence or testing it requires.
Assessment result and file revisions
[Written response or report amendment reference], [conditions or tests, if any], [BOM and technical file revisions]. Record the declaration of conformity review and whether its content or supporting reference needs updating under the applicable requirements.
Production cutover and release
[First affected production lot or serial range], [material lot if tracked], [responsible approver and decision date]. Note whether any finished units still contain the old part and how the factory will distinguish the two builds.

For the capacitor, record its place in the circuit and the reference designator as well as the supplier part number. Two capacitors can have the same nominal capacitance while serving different roles. Ask the factory to mark the position on the applicable schematic and explain why it proposes the replacement. If both parts change, list the combinations the factory expects to build and ask the assessor which configuration its response covers. Keep the exact bill of materials for any sample sent for testing so the result can be matched to production units later.

If the supplier proposes the substitution after assembly has started, ask it to identify what is in work, what is packed and what has shipped. Compare those records with the cutover you expected. If the cutover cannot be pinned to one lot, record the range that could contain the changed part and follow your quality team’s hold and release process for that range.

For EU-market products, see section 4.3 of the European Commission’s Blue Guide on EU product rules for guidance on linking technical documentation to identifiable product versions where a redesign and reassessment occur. The record above supports that traceability. The requirements for a specific product and market determine what evidence, assessment and documentation are needed.

Which changes need lab review

  • Transformers, optocouplers and Y capacitors (insulation).
  • Fuses, varistors and protective parts.
  • PCB layout or material.
  • Housing material.
  • Power devices and controllers (may affect EMC and efficiency).

Non-critical parts usually only need a record in the technical file, but ask the lab if unsure.

DoC

If the standards and model stay the same and the report is amended, the DoC may not need changes. If the model identifier or standards change, update it.

Second sources

Good practice is to include approved alternative components in the original report. That gives flexibility during shortages without later amendments.

Samples

Request samples with the new components and compare performance, temperatures and appearance before approving the change.

Firmware changes

Firmware changes in the charger’s controller can affect PD behaviour and EMC. Treat them as changes requiring notification and assessment too.

Records

Keep a change log: date, change, assessment, lab response, documents updated, affected batches. Market surveillance or retailers may ask.

Confirm with Wecent their change notification process and whether reports list alternative components.

Where this answer says confirm with Wecent, the detail is not published on the product page and has to come from the datasheet or the factory. General facts come from the standards bodies, regulators or device makers named in the text.

Three more perspectives

Wecent Editorial Team · Purchasing perspective

Add a change notification clause to the supply agreement, with a notice period and the requirement for your written approval.

Wecent Editorial Team · Compliance/QC perspective

Ask the lab for a quote on assessing the change before approving it. Costs are often small compared with the risk of shipping products not covered by reports.

Wecent Editorial Team · After-sales perspective

Track returns by batch after a component change. Early detection of issues depends on knowing which batches contain new parts.