A social-compliance file at a charger factory is a dossier, not a product certificate. amfori BSCI and a SMETA report tell a buyer how a named site was assessed for labour and related issues on a given date. They do not, by themselves, prove electrical safety, USB protocol behaviour or a quality system. This page is the audit-scope request a charger buyer should write, and the way to read the file past a headline grade. It does not state that any one factory, including WECENT, currently holds a BSCI or Sedex file; that is a fact a buyer verifies on the current report.

For the rest of a supplier file, see the charger-supplier due-diligence checklist and document and sample evaluation.

BSCI, SEDEX and SMETA: what each document actually is

BSCI is amfori’s Business Social Compliance Initiative: a social audit of eighty-one questions with a grade from A to E, not a certification. Sedex is the platform on which a SMETA report is shared. SMETA is the Sedex Members Ethical Trade Audit, a methodology measured against the ETI Base Code, ILO conventions and local law.

Those three names are often used as if they were interchangeable badges. They are not. An amfori BSCI audit rates each of the eighty-one questions Yes, No, Partial or Not applicable from observations, interviews and documents, and sits on a two-year cycle. A buyer who asks only “do you have BSCI?” will receive a website claim. A buyer who asks for the current report, the site name, the date, the grade or pillar findings, and the auditor company will receive a file that can be read. SMETA is offered as a two-pillar assessment of labour and health and safety, or as a four-pillar assessment that also covers environment and business ethics. Only Sedex Affiliate Audit Companies may perform a SMETA, and Sedex states that a SMETA is uploaded only for a current member. The table below is the vocabulary a request should use.

NameWhat it isWhat it is not
amfori BSCIA social audit against the amfori Code, 81 questions, 13 Performance Areas, grade A–EA product certificate, a pass/fail mark, or a quality or safety report
SedexA membership platform on which a SMETA can be shared with customersThe audit methodology itself
SMETAA site audit against the ETI Base Code, ILO conventions and local law, in two or four pillarsA certification, or a substitute for electrical-safety or protocol work

The audit-scope questions a charger buyer should write into an NDA’d request

Under a non-disclosure agreement, ask for the current BSCI or SMETA report for the exact legal entity and the exact address that will build the charger, including any dormitory or warehouse the audit included or excluded. Ask for the audit date, the expiry or next-cycle date, the grade or pillar findings, the auditor company, whether the visit was fully announced, and whether findings remain open. Ask whether the file is a shared audit other customers already rely on, and which buildings it covers. Those questions belong in the request, not in a later surprise.

How to read a SMETA report without stopping at the overall grade

An overall grade or a clean cover page is not the report. Read the non-compliances, the Corrective Action Plan, the worker-interview notes the methodology allows you to see, and any finding on hours, wages, health and safety, or young workers. A four-pillar report has environment and business-ethics sections that a two-pillar report does not. A finding that is “closed” should still show what evidence closed it. If the PDF is only a summary, amfori and Sedex both remind buyers that the full file sits on the member platform; ask for access or a complete extract, not a cropped first page.

Shared-audit, expiry and site-scope traps in multi-building charger groups

Electronics suppliers often occupy more than one building. A report for a showroom address is not a report for the SMT hall that will run the order. A shared audit reduces duplication, which is a legitimate benefit, but it is only useful if the audited site is the production site, the report is still inside its cycle, and open findings are visible. amfori’s two-year cycle requires a follow-up between two and twelve months when the grade is C, D or E, and a full audit within two years when the grade is A or B. A report that has passed those windows is a historical document, not a current one.

What a social audit does not replace: quality, safety and protocol work

A social audit does not replace a quality-system review, an electrical-safety file, or USB protocol work. Those are different questions, asked of different evidence: process records and outgoing tests, a compliance and certification dossier, and a protocol table. A factory may have a strong BSCI grade and a weak hipot gate, or the reverse. Commissioning a social audit does not retire the other two files, and a product certificate does not retire the social file. For manufacturing context, see GaN charger manufacturing and sourcing.

White 100W GaN wall charger with a European plug, one USB-C port and one USB-A port, housing marked 100W GaN+
A finished charger is the product a social audit does not itself qualify. Safety, protocol and quality remain separate files. Photograph from the WEP-100-C product page.

Labour, working-hours and dormitory findings typical in electronics clusters — how to follow up, not how to excuse

Working-hours, wages and dormitory findings appear often in electronics supply chains. The honest response is a Corrective Action Plan with dates, owners and evidence, not an excuse that “the cluster works that way.” Follow up on hours records, overtime consent, wage calculations, and whether a dormitory was inside or outside the audit scope. amfori recommends a follow-up audit two to three months after a full audit when improvement must be shown. A buyer who accepts a narrative without evidence is not reading the file.

When a buyer should commission their own audit instead of accepting a shared one

Commission a new audit when the shared file is for a different site, is outside its cycle, hides open findings, or when the program’s risk or customer requirements demand a first-party view. Commission one also when the last visit was fully announced and the buyer needs a more realistic snapshot: amfori has not accepted fully announced BSCI audits since September 2024, as stated in its announcement on fully announced social audits and in its amfori BSCI programme pages. A new audit has a cost and a lead time; those are reasons to schedule it, not reasons to rely on a file that does not cover the factory that will build the charger.

Contract language that ties a valid audit to order release, without invented clauses presented as WECENT’s

This page does not publish WECENT contract terms and does not offer a clause as if it were a factory’s standard wording. A buyer’s own counsel can consider language that makes a current, in-scope social audit a condition of order release, that names the legal entity and the address, and that requires notice of a failed follow-up or a change of site. The commercial point is simple: the file that was shown at qualification should still be the file that applies when goods ship. How that is drafted is a legal question for the parties, not a website template.

Document pack to request alongside ISO 9001 and test reports

Request the social-audit report in the same pack as a quality-system certificate, if the factory holds one, and as the safety and protocol test reports for the SKU. Asking for an ISO 9001 certificate is a document request; this article does not assert that any named factory holds it. The pack should also include the legal-entity name, the factory address list, and a statement of which buildings the social audit covered. A charger OEM, ODM and wholesale discussion can then sit on a complete file, not on a badge.

Metallic-gray 140W multi-port GaN charger with a UK three-pin plug and four output ports on the front face
Multi-port chargers still require a social-compliance file for the site that builds them, and a separate safety and protocol file for the product. Photograph from the WEX140S product page.

Claims a factory website may make that the audit file does not support

A website that says a factory is “BSCI certified,” “SEDEX approved,” or “fully compliant with all social standards” is making claims the underlying programmes do not issue as certifications. amfori states that BSCI is not a certification. Sedex states that SMETA is a continuous-improvement methodology, not a certification. A badge without a current report, a site address and a date is a marketing line. The audit file either supports a precise, dated statement about a named site, or it does not. Where it does not, the website claim should be set aside.

Conclusion

A charger buyer should request a current, in-scope BSCI or SMETA report for the site that will build the order, read the findings rather than the grade, and keep social, quality and product-safety files as separate evidence. Website badges are not that evidence. This page does not claim a BSCI or Sedex status for WECENT; that status, if any, is whatever a current report shows.

If your team is scoping a social-compliance request for a charger program, you can raise the intended site and document pack through the charger OEM, ODM and wholesale page. This is a request for a project discussion, not a claim about any current audit file.

FAQ

What are the 5 C's of auditing?

This mnemonic is used in other audit and credit-control contexts. It is not the published framework for an amfori BSCI audit or a SMETA audit. amfori BSCI assesses a site through eighty-one questions and thirteen Performance Areas, with a grade from A to E. SMETA is measured against the ETI Base Code, ILO conventions and local law, in a two-pillar or four-pillar scope. A charger buyer should ask for the actual report and the Performance Area or pillar findings, not for a five-letter slogan that those methodologies do not use.

What does BSCI stand for?

amfori states that BSCI stands for Business Social Compliance Initiative. It is a member-based social-compliance programme, not a product certificate and not a pass-or-fail mark a factory can print as a substitute for a safety report. Full audit reports sit on the amfori Sustainability Platform and are visible to members and the audited supplier. A charger buyer should request the current grade, the date, the site name and the Performance Area findings, and should not treat a website badge as the file.

What is an amfori BSCI audit?

amfori describes a BSCI audit as an on-site assessment of eighty-one questions, rated Yes, No, Partial or Not applicable, from observations, interviews and document review, producing a grade from A to E. It is not a certification. The audit cycle is two years: a follow-up is required between two and twelve months if the grade is C, D or E, and amfori recommends that follow-up at two to three months; a site with A or B faces a full audit within two years. The assessment covers thirteen Performance Areas, including working hours, health and safety, and young workers.

What are the different types of manufacturing audits?

A charger program typically meets three different audits that do not replace each other. A social audit, such as amfori BSCI or SMETA, looks at labour, hours, health and safety, and, in a four-pillar SMETA, environment and business ethics. A quality-system audit looks at process control and records. A safety or protocol audit looks at the product: electrical safety, EMC, energy and USB behaviour. Commissioning one file does not retire the others. Buyers should also distinguish a shared audit on a named site from a new audit they commission themselves.

{
“@context”: “https://schema.org”,
“@type”: “FAQPage”,
“mainEntity”: [
{
“@type”: “Question”,
“name”: “What are the 5 C’s of auditing?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “This mnemonic is used in other audit and credit-control contexts. It is not the published framework for an amfori BSCI audit or a SMETA audit. amfori BSCI assesses a site through eighty-one questions and thirteen Performance Areas, with a grade from A to E. SMETA is measured against the ETI Base Code, ILO conventions and local law, in a two-pillar or four-pillar scope. A charger buyer should ask for the actual report and the Performance Area or pillar findings, not for a five-letter slogan that those methodologies do not use.”
}
},
{
“@type”: “Question”,
“name”: “What does BSCI stand for?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “amfori states that BSCI stands for Business Social Compliance Initiative. It is a member-based social-compliance programme, not a product certificate and not a pass-or-fail mark a factory can print as a substitute for a safety report. Full audit reports sit on the amfori Sustainability Platform and are visible to members and the audited supplier. A charger buyer should request the current grade, the date, the site name and the Performance Area findings, and should not treat a website badge as the file.”
}
},
{
“@type”: “Question”,
“name”: “What is an amfori BSCI audit?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “amfori describes a BSCI audit as an on-site assessment of eighty-one questions, rated Yes, No, Partial or Not applicable, from observations, interviews and document review, producing a grade from A to E. It is not a certification. The audit cycle is two years: a follow-up is required between two and twelve months if the grade is C, D or E, and amfori recommends that follow-up at two to three months; a site with A or B faces a full audit within two years. The assessment covers thirteen Performance Areas, including working hours, health and safety, and young workers.”
}
},
{
“@type”: “Question”,
“name”: “What are the different types of manufacturing audits?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “A charger program typically meets three different audits that do not replace each other. A social audit, such as amfori BSCI or SMETA, looks at labour, hours, health and safety, and, in a four-pillar SMETA, environment and business ethics. A quality-system audit looks at process control and records. A safety or protocol audit looks at the product: electrical safety, EMC, energy and USB behaviour. Commissioning one file does not retire the others. Buyers should also distinguish a shared audit on a named site from a new audit they commission themselves.”
}
}
]
}

Related Posts